Search results for "Resource constraints"

showing 5 items of 5 documents

The Design and Execution of Performance Management Systems at State Level: A Comparative Analysis of Italy and Malaysia

2016

ABSTRACTThis comparative study analyses the experience of Italy and Malaysia in the design and execution of performance management systems at the state level. The article investigates how performance management systems have changed over the past decades, the motivations behind their metamorphoses, their common elements across the two countries, and what accounts for the respective progress. It also investigates the role that the institutional framework plays in making performance management systems robust. The study presents policy recommendations on how governments can create more robust performance management systems for enhanced accountability and transparency in an age of resource const…

Process managementPublic AdministrationPerformance managementmedia_common.quotation_subjectLegislationlegislationcomputer.software_genreSettore SECS-P/07 - Economia AziendaleState (polity)Systems management0502 economics and business050602 political science & public administrationEconomicsperformance managementBusiness and International Managementmedia_commonbusiness.industryInstitution05 social sciencesResource constraintsEnvironmental resource managementpublic administration paradigmInstitutions; legislation; public management reform; performance management; public administration paradigmpublic management reform0506 political scienceTransparency (graphic)Accountabilitybusinesscomputer050203 business & managementInternational Journal of Public Administration
researchProduct

Economic lot scheduling on multiple production lines with resource constraints

2003

Abstract This paper deals with the multiple production line economic lot scheduling problem, where some items cannot be produced concurrently since they compete for some discrete resources. In particular, cyclic schedules are sought for a problem where identical production lines are present, lost sales are allowed, and minimization of the long-range production, setup, inventory, and shortage penalty costs are required. A heuristic procedure for this problem is introduced, a numerical example is worked out and some computational experiments are presented.

Production lineEconomics and EconometricsMathematical optimizationResource constraintsScheduling (production processes)Management Science and Operations ResearchGeneral Business Management and AccountingIndustrial and Manufacturing EngineeringEconomic lot scheduling problemFair-share schedulingGenetic algorithm schedulingEconomicsMinificationHeuristicsInternational Journal of Production Economics
researchProduct

Theoretical and Practical Fundamentals

2014

Project managers carry out a project with several objectives in mind. They want to finish the project as soon as possible, with the minimum cost, the maximum quality, etc. This chapter studies project scheduling problems when several goals are sought, that is, multi-objective project scheduling problems (MOPSPs) and multi-objective resource-constrained project scheduling problems (MORCPSPs). We will discuss some of the most important issues that have to be taken into account when dealing with these problems. We will also prove some useful results that can help researchers create algorithms for some of these problems.

Risk analysis (engineering)Computer sciencemedia_common.quotation_subjectResource constraintsQuality (business)media_common
researchProduct

Three-dimensional matching based resource provisioning for the design of low-latency heterogeneous IoT networks

2019

Internet-of-Things (IoT) is a networking architecture where promising, intelligent services are designed via leveraging information from multiple heterogeneous sources of data within the network. However, the availability of such information in a timely manner requires processing and communication of raw data collected from these sources. Therefore, the economic feasibility of IoT-enabled networks relies on the efficient allocation of both computational and communication resources within the network. Since fog computing and 5G cellular networks approach this problem independently, there is a need for joint resource-provisioning of both communication and computational resources in the networ…

Settore ING-INF/05 - Sistemi Di Elaborazione Delle InformazioniIoTbusiness.industryComputer scienceDistributed computingResource constraintsResource Provisioning020206 networking & telecommunicationsProvisioning02 engineering and technologyFogPRBFog computing0202 electrical engineering electronic engineering information engineeringCellular networkMatching020201 artificial intelligence & image processingLatency (engineering)Internet of ThingsbusinessRaw dataSAP5G5G
researchProduct

Changes in the Scheduling Process According to Observed Activity-travel Flexibility

2014

Abstract In this work we analyze the reasons for changing pre-planned activities and travels episodes considering the type of modification observed during the scheduling process. Specifically we selected a small sample from those pre-planned episodes that are no executed at all as a pilot study. The data analyzed was collected in the first wave of a weekly activity-travel panel survey carried out in Valencia (Spain) in 2010. Each survey wave consisted on a face-to-face interview to generate a pre-planned activity agenda for the following week, an activity-travel diary implemented on mobile phones to collect activities and travels as they are executed, and in-depth telephone interviews to in…

Panel surveyEngineeringbusiness.industryResource constraintsActivity Scheduling ProcessScheduling (production processes)Small sampleRescheduling analysisINGENIERIA E INFRAESTRUCTURA DE LOS TRANSPORTESQualitative analysisCategorizationGeneral Materials ScienceOperations managementQualitative AnalysisbusinessProcedia - Social and Behavioral Sciences
researchProduct